soalan lazim2| hubungi kami2| aduan2| petalaman3

Charges Payable by Consignee Or Consignor

GENERAL CHARGES

No.

Description of cargo

Per tonne or part thereof
(RM)
Per unit (RM)
1.
Bulk Cargo:
   
 
(a) mineral ores
 0.80 -
 
(b) other cargoes
 1.20 -
2.
Break bulk cargo/containerized cargo
 1.40 -
3. Break bulk cargo/containerized cargo entitled to transhipment rates and direct vessel to vessel transhipment per operation  0.70 -
4. Motorcar, station wagon and trailer  - 6.00
5. Lorry, bus, truck, van or other vehicles  - 12.00
6.
Mail or mail parcels
 - 0.70

WHARF HANDLING CHARGES

1. WHARF HANDLING CHARGE FOR HANDLING OF CARGO AT THE COMMISSION’S WHARF

No.

Cargo

Description

Per tonne or part thereof
(RM)
1.
Breakbulk
 
(a) To vehicle or railway wagon direct or vice versa 4.10
(b) To vehicle or railway wagon via shed or open area or vice versa 8.20
2.
Timber
 
(a) To vehicle or railway wagon direct or vice versa 7.60
(b) To vehicle or railway wagon via shed or open area or vice versa 10.70
3.
Dry bulk
To vehicle or railway wagon direct or vice versa 2.40
4.
Liquid bulk
Private pipelines:
 
    (a) dangerous goods 1.90
    (b) non-dangerous goods 1.80
5.
Heavy lift cargo above 5 tonnes up to 15 tonnes
 
(a) To vehicle or railway wagon direct or vice versa 14.00
(b) To vehicle or railway wagon via shed or open area or vice versa 22.00
6.
Heavy lift cargo above 15 tonnes
 
(a) To vehicle or railway wagon direct or vice versa 19.50
(b) To vehicle or railway wagon via shed or open area or vice versa 32.50

2. WHARF HANDLING CHARGE FOR HANDLING OF MOTOR VEHICLE AT THE COMMISSION’S WHARF

No.

Description

Per unit
(RM)
1. Motorcar or trailer 41.00
2. Lorry, bus, truck, van or other vehicles 82.00

3. WHARF HANDLING CHARGE FOR HANDLING OF TRANSHIPMENT CARGO AT THE COMMISSION’S WHARF

No.

Description

Per tonne or part thereof
(RM)
1. Package up to 5 tonnes 11.50
2. Package above 5 tonnes up to 15 tonnes 30.40

STORE RENT CHARGES

    1. Store rent charges shall be payable on cargoes lying in the Commission's premises. The store rent charges shown in the scale of rates against each calendar day is an accumulated rate.

    2. The store rent charges shall be as follows:
      1. Store rent on import cargo stored inside shed

        Days/weeks or part thereof Per tonne or part thereof
        (RM)
        First to fourthday Nil
        Fifthday 2.60
        Sixthday 3.30
        Seventhday 3.90
        Eighthday 5.90
        Ninthday 7.80
        Tenthday 9.80
        Eleventhday 11.70
        Twelfthday 14.30
        Thirteenthday 16.90
        Fourteenthday 19.50
        Third and subsequent week - per week 19.50
      2. Store rent on import cargo stored in the open area

        Days/weeks or part thereof

        Per tonne or part thereof
        (RM)
        First to fourthday Nil
        Fifthday 1.30
        Sixthday 1.70
        Seventhday 2.00
        Eighthday 3.00
        Ninthday 3.90
        Tenthday 4.90
        Eleventhday 5.90
        Twelfthday 7.20
        Thirteenthday 8.50
        Fourteenthday 9.80
        Third and subsequent week - per week 9.80

        Store rent charges on motor vehicles shall be based on the measurement weight at open storage rate.

      3. Store rent on export cargo stored in shed

        Days/weeks or part thereof

        Per tonne or part thereof
        (RM)
        First to seventhday Nil
        Eighthday 2.60
        Ninthday 3.30
        Tenthday 3.90
        Eleventhday 5.90
        Twelfthday 7.80
        Thirteenthday 9.80
        Fourteenthday 11.70
        Third and subsequent week - perweek 11.70
      4. Store rent on timber (export)

        Days/weeks or part thereof Per tonne or part thereof
        (RM)
        First to fourteenthday Nil
        Fifteenthday 2.60
        Sixteenthday 3.30
        Seventeenthday 3.90
        Eighteenthday 5.90
        Nineteenthday 7.80
        Twentiethday 9.80
        Twenty-firstday 11.70
        Fourth and subsequent week - perweek 11.70
      5. Store rent on export cargo stored in the open

        Days/weeks or part thereof Per tonne or part thereof
        (RM)
        First to seventhday Nil
        Eighthday 1.30
        Ninthday 1.70
        Tenthday 2.00
        Eleventhday 3.00
        Twelfthday 3.90
        Thirteenthday 4.90
        Fourteenthday 5.90
        Third and subsequent week - perweek 5.90

        Store rent charges on motor vehicles shall be based on the measurement weight at open storage rate.

      6. Store rent on cargo stored in bonded warehouse

        No. Type Per tonne per week or Part Thereof
        (RM)
        1. Tobacco (per 0.25 tonne) 1.30
        2. Liquor (per 100 litres) 2.00
      7. Long storage rental is RM5.20 per tonne per week or part thereof

CONTAINER TARIFF

  1. Wharf handling charges excluding stevedore for container handled at the Commission's Wharf shall be as follows:

    1. Vessel using own derrick

      No.
      Status of container
      Per container (RM)
      Up to 20 feet length
      Over 20 feet length
      1. FCL/empty 104.00 156.00
      2. LCL 293.00 442.00
      3. Transshipment 78.00 117.00
    2. Vessel using port crane/Ro-Ro ramp

      No.
      Status of container
      Per container (RM)
      Up to 20 feet length
      Over 20 feet length
      1. FCL 182.00 273.00
      2. Empty 182.00 273.00
      3. LCL 371.00 559.00
      4. Transshipment 156.00 234.00
  2. Wharf handling charges for shifting containers handled at the Commission's Wharf shall be as follows:

    1. Vessel using own derrick

      No.
      Services 
      Per container (RM)
      Up to 20 feet length
      Over 20 feet length
      1. Without landing and reshipping operation - -
      2. With landing and reshipping operation 104.00 156.00
    2. Vessel using port crane

      No.
      Services 
      Per container (RM)
      Up to 20 feet length
      Over 20 feet length
      1. Without landing and reshipping operation 78.00 117.00
      2. With landing and reshipping operation 260.00 390.00

      Additional movement charge shall be payable if there are additional movements within the container yard.

  3. Charge payable on opening hatch cover, placing the hatch cover at next hatch or on wharf and subsequently closing hatch is RM156.00 per operation.

  4. Additional movement charges shall be payable on any additional movement within the container yard as follows:

    No.
    Services 
    Per container (RM)
    Up to 20 feet length
    Over 20 feet length
    1. Additional movement of lifting on or lifting off operations 59.00 91.00
  5. Storage charges of containers or breakbulk cargo shall be as follows:

    No.
    Status
    Per container (RM)
    Up to 20 feet length
    Over 20 feet length
    1. Empty container - per day 5.30 10.60
    2. Loaded container - per day 10.60 21.20
    3. Overheight/Overwidth/Overlength container - per day 15.90 31.90
    4. Breakbulk cargo in CFS Same charge for storage ofcargo in shed

    When a loaded container is unstuffed and is empty, the empty container shall not be given free storage and the rates for storing such container shall be in accordance with tariff rate.

  6. Free storage period shall be as follows:
  7. Shut out containers

    1. Charges for container stacked at an export section and is shut out by the vessel and subsequently delivered to rail or other vehicle shall be as follows:

      No.
      Status
      Per container (RM)
      Up to 20 feet length
      Over 20 feet length
      1. FCL container 104.00 156.00
      2. FCL container including unstuffing 345.00 520.00
      3. LCL container 293.00 442.00
      4. LCL container including unstuffing 533.00 806.00

      The above charges shall be additional to extra movement charges, if any.

    2. Where a container to be exported is shut out by one vessel and subsequently shipped via another vessel-

      (i) additional movement charge shall be payable on the container according to the number of extra movements involved; and

      (ii) free storage days shall be calculated from the date the container is first received.

  8. Charges on reefer container services shall be as follows:

    No.
    Services 
    Per container (RM)
    Up to 20 feet length
    Over 20 feet length
    1. Monitoring services at reefer yard 13.00 26.00
    2. Pre-trip inspections 78.00 78.00
    3. Connecting or disconnecting services on board vessel 20.00 20.00
LINK TO BANK
bank cimb   bank maybank   bank publicbank   bank ambank
QR code
click

QR Code

QR code

Scan this QR Code using your smartphone

 Level 2, Swettenham Pier Cruise Terminal, No. 1A, King Edward Place
10300 George Town, Penang.

604.263.3211 | 604.262.6211 |  sppp[at]penangport[dot]gov[dot]my
Follow Us
icon facebook2  icon twitter  icon instagram3  icon 5s