GENERAL CHARGES
No. |
Description of cargo |
Per tonne or part thereof (RM) |
Per unit (RM) |
1. |
Bulk Cargo:
|
||
(a) mineral ores
|
0.80 | - | |
(b) other cargoes
|
1.20 | - | |
2. |
Break bulk cargo/containerized cargo
|
1.40 | - |
3. | Break bulk cargo/containerized cargo entitled to transhipment rates and direct vessel to vessel transhipment per operation | 0.70 | - |
4. | Motorcar, station wagon and trailer | - | 6.00 |
5. | Lorry, bus, truck, van or other vehicles | - | 12.00 |
6. |
Mail or mail parcels
|
- | 0.70 |
WHARF HANDLING CHARGES
1. WHARF HANDLING CHARGE FOR HANDLING OF CARGO AT THE COMMISSION’S WHARF
No. |
Cargo |
Description |
Per tonne or part thereof (RM) |
1. |
Breakbulk
|
(a) To vehicle or railway wagon direct or vice versa | 4.10 |
(b) To vehicle or railway wagon via shed or open area or vice versa | 8.20 | ||
2. |
Timber
|
(a) To vehicle or railway wagon direct or vice versa | 7.60 |
(b) To vehicle or railway wagon via shed or open area or vice versa | 10.70 | ||
3. |
Dry bulk
|
To vehicle or railway wagon direct or vice versa | 2.40 |
4. |
Liquid bulk
|
Private pipelines:
|
|
(a) dangerous goods | 1.90 | ||
(b) non-dangerous goods | 1.80 | ||
5. |
Heavy lift cargo above 5 tonnes up to 15 tonnes
|
(a) To vehicle or railway wagon direct or vice versa | 14.00 |
(b) To vehicle or railway wagon via shed or open area or vice versa | 22.00 | ||
6. |
Heavy lift cargo above 15 tonnes
|
(a) To vehicle or railway wagon direct or vice versa | 19.50 |
(b) To vehicle or railway wagon via shed or open area or vice versa | 32.50 |
2. WHARF HANDLING CHARGE FOR HANDLING OF MOTOR VEHICLE AT THE COMMISSION’S WHARF
No. |
Description |
Per unit (RM) |
1. | Motorcar or trailer | 41.00 |
2. | Lorry, bus, truck, van or other vehicles | 82.00 |
3. WHARF HANDLING CHARGE FOR HANDLING OF TRANSHIPMENT CARGO AT THE COMMISSION’S WHARF
No. |
Description |
Per tonne or part thereof (RM) |
1. | Package up to 5 tonnes | 11.50 |
2. | Package above 5 tonnes up to 15 tonnes | 30.40 |
STORE RENT CHARGES
-
Store rent charges shall be payable on cargoes lying in the Commission's premises. The store rent charges shown in the scale of rates against each calendar day is an accumulated rate.
- The store rent charges shall be as follows:
-
Store rent on import cargo stored inside shed
Days/weeks or part thereof Per tonne or part thereof
(RM)First to fourthday Nil Fifthday 2.60 Sixthday 3.30 Seventhday 3.90 Eighthday 5.90 Ninthday 7.80 Tenthday 9.80 Eleventhday 11.70 Twelfthday 14.30 Thirteenthday 16.90 Fourteenthday 19.50 Third and subsequent week - per week 19.50 -
Store rent on import cargo stored in the open area
Days/weeks or part thereof
Per tonne or part thereof
(RM)First to fourthday Nil Fifthday 1.30 Sixthday 1.70 Seventhday 2.00 Eighthday 3.00 Ninthday 3.90 Tenthday 4.90 Eleventhday 5.90 Twelfthday 7.20 Thirteenthday 8.50 Fourteenthday 9.80 Third and subsequent week - per week 9.80 Store rent charges on motor vehicles shall be based on the measurement weight at open storage rate.
-
Store rent on export cargo stored in shed
Days/weeks or part thereof
Per tonne or part thereof
(RM)First to seventhday Nil Eighthday 2.60 Ninthday 3.30 Tenthday 3.90 Eleventhday 5.90 Twelfthday 7.80 Thirteenthday 9.80 Fourteenthday 11.70 Third and subsequent week - perweek 11.70 -
Store rent on timber (export)
Days/weeks or part thereof Per tonne or part thereof
(RM)First to fourteenthday Nil Fifteenthday 2.60 Sixteenthday 3.30 Seventeenthday 3.90 Eighteenthday 5.90 Nineteenthday 7.80 Twentiethday 9.80 Twenty-firstday 11.70 Fourth and subsequent week - perweek 11.70 -
Store rent on export cargo stored in the open
Days/weeks or part thereof Per tonne or part thereof
(RM)First to seventhday Nil Eighthday 1.30 Ninthday 1.70 Tenthday 2.00 Eleventhday 3.00 Twelfthday 3.90 Thirteenthday 4.90 Fourteenthday 5.90 Third and subsequent week - perweek 5.90 Store rent charges on motor vehicles shall be based on the measurement weight at open storage rate.
-
Store rent on cargo stored in bonded warehouse
No. Type Per tonne per week or Part Thereof
(RM)1. Tobacco (per 0.25 tonne) 1.30 2. Liquor (per 100 litres) 2.00 -
Long storage rental is RM5.20 per tonne per week or part thereof
-
CONTAINER TARIFF
-
Wharf handling charges excluding stevedore for container handled at the Commission's Wharf shall be as follows:
-
Vessel using own derrick
No. Status of containerPer container (RM)Up to 20 feet lengthOver 20 feet length1. FCL/empty 104.00 156.00 2. LCL 293.00 442.00 3. Transshipment 78.00 117.00 -
Vessel using port crane/Ro-Ro ramp
No.Status of containerPer container (RM)Up to 20 feet lengthOver 20 feet length1. FCL 182.00 273.00 2. Empty 182.00 273.00 3. LCL 371.00 559.00 4. Transshipment 156.00 234.00
-
-
Wharf handling charges for shifting containers handled at the Commission's Wharf shall be as follows:
-
Vessel using own derrick
No.ServicesPer container (RM)Up to 20 feet lengthOver 20 feet length1. Without landing and reshipping operation - - 2. With landing and reshipping operation 104.00 156.00 -
Vessel using port crane
No.ServicesPer container (RM)Up to 20 feet lengthOver 20 feet length1. Without landing and reshipping operation 78.00 117.00 2. With landing and reshipping operation 260.00 390.00 Additional movement charge shall be payable if there are additional movements within the container yard.
-
-
Charge payable on opening hatch cover, placing the hatch cover at next hatch or on wharf and subsequently closing hatch is RM156.00 per operation.
-
Additional movement charges shall be payable on any additional movement within the container yard as follows:
No.ServicesPer container (RM)Up to 20 feet lengthOver 20 feet length1. Additional movement of lifting on or lifting off operations 59.00 91.00 -
Storage charges of containers or breakbulk cargo shall be as follows:
No.StatusPer container (RM)Up to 20 feet lengthOver 20 feet length1. Empty container - per day 5.30 10.60 2. Loaded container - per day 10.60 21.20 3. Overheight/Overwidth/Overlength container - per day 15.90 31.90 4. Breakbulk cargo in CFS Same charge for storage ofcargo in shed When a loaded container is unstuffed and is empty, the empty container shall not be given free storage and the rates for storing such container shall be in accordance with tariff rate.
- Free storage period shall be as follows:
-
Shut out containers
-
Charges for container stacked at an export section and is shut out by the vessel and subsequently delivered to rail or other vehicle shall be as follows:
No.StatusPer container (RM)Up to 20 feet lengthOver 20 feet length1. FCL container 104.00 156.00 2. FCL container including unstuffing 345.00 520.00 3. LCL container 293.00 442.00 4. LCL container including unstuffing 533.00 806.00 The above charges shall be additional to extra movement charges, if any.
-
Where a container to be exported is shut out by one vessel and subsequently shipped via another vessel-
(i) additional movement charge shall be payable on the container according to the number of extra movements involved; and
(ii) free storage days shall be calculated from the date the container is first received.
-
-
Charges on reefer container services shall be as follows:
No.ServicesPer container (RM)Up to 20 feet lengthOver 20 feet length1. Monitoring services at reefer yard 13.00 26.00 2. Pre-trip inspections 78.00 78.00 3. Connecting or disconnecting services on board vessel 20.00 20.00